Page 50 - LIFT VISION 48th ISSUE
P. 50

A 30-YEAR JOURNEY






           A 30-YEAR JOURNEY IN              We are in Turkey in the 1990s.      gic partner.
            AN ELEVATOR CABIN                Construction sites are full of courage, but   2013–2019  The Quality and Awareness
                   TURKEY’S                  standards are still developing.     Floor

            CONSTRUCTION AND                 The key question about elevators is simple:   This floor is quieter…
                                                                                 but deeper.
            ELEVATOR INDUSTRY                “Does it work?”

           JOURNEY (1996–2026)               CE markings are unfamiliar          The question is no longer,
                                                                                 “How many floors?”
                                             Maintenance logs are optional       The real question becomes:
                                             Safety relies more on intention than regu-  “How  safe,  how  efficient,  how  sustainab-
                                             lation                              le?”

                                             The construction sector is rising fast, and   Periodic inspections
                                             the  elevator  industry  is  doing  its  best  to   Digital control systems
                                             keep up.                            Energy efficiency
                                                                                 Rising local content ratios
                                             The mindset of the era is clear:
                                             Build first, refine later.          These years are a moment of reflection for
                                                                                 the sector.
                                             Looking  back,  there  were  many  shortco-
                                             mings.                              We  learn  to  build  not  just  buildings,  but
                                                                                 brands.
                                             But one thing was achieved:
                                             We learned how to produce.          And a critical threshold is crossed:
                 by Ceyla AKIN                                                   Local  production  begins  to  target  export
                                             2003–2012  The Acceleration Floor   markets, not only domestic demand.
                 Mechanical Engineer         The cabin gains speed.
                   Director Miracle                                              2020–2022 The Emergency Stop Floor
               Engineering &Consultancy      Mass housing projects, shopping malls, hi-  And suddenly… we stop.
           ceylaakin@miracleengineering.co.uk,   gh-rise buildings…
              info@miracleengineering.co.uk                                      The pandemic.
                                             Elevators are no longer a luxury; they are   Construction sites fall silent, supply chains
          We press a button.                 essential infrastructure.           break.
          The doors close.
          The cabin gently shakes.           The sector begins to realize something im-  But elevators keep moving.
                                             portant: Speed alone is not enough.  In hospitals, logistics centers, public buil-
          This is not an ordinary ride.                                          dings…
          This  is  Turkey’s  journey  from  1996  to   Standards start to take shape
          2026, seen through the lens of the constru-  Regulations reach the field  This period proves one thing clearly:
          ction and elevator industry.       Local manufacturers grow stronger   The elevator industry is a strategic sector.


          A journey sometimes noisy,         The instinct to “import” slowly transforms   It also reveals another truth:
          sometimes dusty,                   into the confidence to say,         Companies  investing  in  local  technology
          occasionally interrupted…          “We can build this ourselves.”      and domestic production
          but always moving upward.                                              weather the crisis with far less damage.
                                             The elevator industry steps out of the sha-
          1996–2002   The “Good Enough” Floor  dow of construction and becomes a strate-  Dependence on imports shows its true cost.




               LIFTVISION
          50   1th QUARTER 2026
   45   46   47   48   49   50   51   52   53   54   55